Our engineers completed an independent design review for a transformer foundation at a substation in New York State. The transformer foundation was designed using the owner’s design specifications. Following the review, XCEED signed and sealed the design for the foundation.
You may also like
We were able to help our client save over $40,000 on the design and construction of an articulating solar array.
After an Extended Power Uprate (EPU), a power plant was having problems with Net Positive Suction Head (NPSH) on the Feedwater Pumps. They were worried about damaging the pump, but they also didn’t want to replace it. We helped them without changing the pump.
We have helped sites prepare for their TI-2515/191 inspections by using a tool we call the Compliance Matrix. Give us a call for more information.
We found that API-650 tanks are more robust than most expect. The water in this tank absorbed 30% of the energy of a truck going 93 mph!