Our engineers completed an independent design review for a transformer foundation at a substation in New York State. The transformer foundation was designed using the owner’s design specifications. Following the review, XCEED signed and sealed the design for the foundation.
You may also like
Using FEA and hand calculations, we were able to help a nuclear utility evaluate RCP Seal Leakoff pipes and components for high temperature and pressure.
Tornado generated missiles can wreak havoc, especially on a nuclear power plant. We helped one site design and optimize a protection system.
We diagnosed the failure of a nozzle check valve in an Auxiliary Feedwater System at a power plant. In summary: great valve, wrong application.
After an Extended Power Uprate (EPU), a power plant was having problems with Net Positive Suction Head (NPSH) on the Feedwater Pumps. They were worried about damaging the pump, but they also didn’t want to replace it. We helped them without changing the pump.