Overview: In collaboration with a local industrial contractor, XCEED prepared comprehensive shop drawings and supporting structural calculations for the steel framework supporting a pallet elevator and conveyor system. The detailing scope included accommodating manufacturer-specified equipment loadings, designing anchor bolt layouts, producing steel fabrication details, and coordinating necessary modifications to existing […]
Daily Archives: April 26, 2025
A research institution required a modular, hand-assembled maintenance platform to service a component that is accessed only infrequently. The design challenge included the need for a large central opening and the ability to adapt to three specific elevation levels. Design: Taking into account standard maintenance practices, crane hook height limitations, […]
Overview: The Large Ballast Tank (LBT) serves as a surge volume for off gas from a critical refrigeration cycle. The temperature of the outdoor tank is closely linked to the system pressure, and variations in temperature can significantly impact experimental results. HVAC Calculations: XCEED conducted detailed HVAC calculations for the […]
Project Overview: XCEED developed, designed, and analyzed a double wall piping system specifically for the safe transport of deuterium gas. This system was crucial for ensuring the integrity and safety of the gas handling processes within the facility. Design and Routing: Compliance and Analysis: Outcome: The successful development and analysis […]
Helium Covergas System Enhancement Overview: A research facility uses helium covergas to minimize contamination of the process fluid. The existing system, a vintage 1960s circulating blower system, was deemed outdated and inefficient. Investigation and Technology Selection: XCEED conducted a thorough evaluation of several modern blower/compressor technologies to replace the antiquated […]